Acquiring Hardware

I haven’t posted in about a week, but I’ve been pretty busy acquiring a bunch of stuff that I’ll need in the coming weeks. I decided it was high time that I think about wiring – so I did, coming up with a few diagrams, wire lists, and connector...

Landing Light Wiring

I continued some of the electrical work for the starboard wing, securing wiring and adding electrical connectors for the lights. I also decided it was time to get rid of the shipping crate for the fuselage kit. The first crates I received last year were assembled using screws, which...

Center Fuselage Parts

In and around holiday events this past weekend I was able to put in a few hours on center fuselage parts. Not much to show, other than a bunch of floor ribs that have been cleaned and primed. Speaking of priming – I found that I spend a lot...

Pitot Installation Complete, Electrical Checks OK

Although I’ve had it for a while, I never finished the pitot tube installation on the left wing. It was one of few remaining tasks to do before I close out the wing. I finished up wiring the heater controller module, then took care of the plumbing. There are...

Wing Riveting & Wiring

Today I continued attaching the fuel tank to the wing, riveting everything but the 4mm rivets at the back edge of the top skin — I’m leaving these cleco’d for now until it’s time to attach the top wing skins. I also had a bunch of rivets to put...

Wing skins test fit

Spent a good amount of time over Labor Day weekend making progress on the left wing.  With all the ribs and spars cleco’d together, the next step is to test fit the top and bottom skins.  I ran out of 5/32″ clecos, so the skins are held on mostly...

Left Wing Wiring Installed

Time spent: 6.3 hours Busy day doing various tasks on the left wing. First, I ran the pitot & AoA lines and built the little standoffs per the manual. Since it was nice outside, I built a little fixture so that I could prime the inside of the wing...