Skip to content
Jetshine's Sling 4
  • Home
  • About
  • Tools
  • Process
  • Links
Jetshine's Sling 4
A blog documenting the adventure of building a kit plane

Links

Sling Airplane Builders

  • Craig Maiman – Sling 4 (USA)
  • Jean-François Doyon – Sling 4 (Canada)
  • Robert Zaleski – Sling 2 (USA)
  • Jim Pavlick – Sling 4 (USA – CA)
  • Peter Calley – Sling 4 (Australia)
  • Pascal Latten – Sling 2 (Netherlands)
  • John Weiser – Sling 4 (USA)
  • Peter V – Sling 4 (Austria)

More Resources

  • Sling Builders Facebook group
  • The Airplane Factory USA

Aircraft Lighting

  • AeroLEDs (USA)
  • Aveo Engineering (USA/Czechia)
  • Avio Lights (Poland)
  • JMH Innovations (USA) / Thiessen (Germany)
  • Kuntzleman Electronics (USA)
  • Simplepack Aircraft Solutions (Brazil)
  • Whelen (USA)

Sling Accessories

  • Bruce’s Custom Covers

Search

Categories

  • Electrical (57)
    • Antennas (7)
    • Avionics (23)
    • Lights (8)
    • Wiring (29)
  • Empennage (20)
    • Elevator (6)
    • Horizontal Stabilizer (6)
    • Rudder (3)
    • Vertical Stabilizer (5)
  • Everything Else (76)
    • Chemicals (1)
    • Design Changes (24)
    • Primer (4)
    • Process (10)
    • Rivets (5)
    • Service Bulletins (1)
    • Tools (10)
    • Training (1)
    • Workshop (10)
  • Finishing Kit (4)
  • Firewall Forward (26)
    • Engine (11)
    • Propeller (1)
  • Fuselage (100)
    • Canopy (10)
    • Center Console (5)
    • Center Fuselage (62)
    • Parachute (1)
    • Plumbing (9)
    • Rear Fuselage (17)
    • Seats (3)
    • Upholstery (8)
  • Progress Reports (2)
  • Undercarriage (10)
  • Wings (66)
    • Ailerons (5)
    • Flaps (3)
    • Fuel Tanks (17)

Subscribe to Email Updates

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 34 other subscribers

Tags

3D Printed Bearings brakes Chair fuel pumps Fuel tanks Fuselage Page D22 gaskets grip inventory joystick luggage Oshkosh Page D3 Page D4 Page D6.5 Page D11 Page E13 prep primer repairs rotax Rotax 915 self etching primer SEM service bulletin Sheet E6 Sling TSi torque tube Tosten valve versa-tube Viton wire harness Workshop

Hours Log

Total Hours: 798.7  /  1,400  (57%)
Not Including inventory, workshop prep, design changes (892 hrs)

Project Start: April 2018

Goal Completion: Late 2021

Progress

Percent Complete: 57%

© 2025 Jetshine's Sling 4 | Powered by Customizable Blogily